Our published tiers put a Power BI engagement at £52.7k, £73.9k or £114.5k over two years by business size. What is inside each and what moves the price.
A Power BI consulting engagement for a mid-sized company costs, on our published Analytics Acceleration Programme tiers, £52.7k for a business of 25 to 100 people, £73.9k for 100 to 500 and £114.5k for 500 and over, each as an indicative two-year investment that covers a four-week Establish phase, an eight to twelve week build of a certified semantic model and the priority reports, and continuity support afterwards, priced as fixed phases rather than day rates. Licences sit outside that and are small: Power BI Pro at £10.80 per user per month, Premium Per User at £18.50, and free viewing from an F64 Fabric capacity. The price moves with three things, the number of source systems, the number of business domains needing their own model, and whether a data platform has to be built underneath, and it does not move much with the number of reports, because reports on a good model are days each. We publish the tiers because the market is opaque and most buyers have no way to tell a £30k quote from a £130k one. This post sets out what is inside each tier, what moves the price, and how to compare quotes.
What is inside the price
The Establish phase, four weeks: definitions agreed with finance and signed, sources and owners confirmed, security designed, the report backlog prioritised, and the architecture decided. The build, eight to twelve weeks for one domain: the data landed, a star schema and a certified semantic model with measures defined once and reconciled to the ledger, the priority reports built with the people who will use them, row-level security tested, Git source control and deployment pipelines set up. Enablement: training for your analysts on building over the model. Continuity: a defined support arrangement for the rest of the two years, with a named consultant and quarterly reviews. The deliverable is the model and the owner, not a dashboard gallery. Can a Power BI consultancy build certified, governed datasets rather than ad hoc reports? describes what that model contains.
What moves the price up
More source systems: each one is a pipeline, a conformed mapping and a reconciliation, and combining a CRM, payroll or project system with the ERP is four to eight weeks of work on its own. More domains: finance, sales and operations each want their own model on shared dimensions. A platform underneath: when reports span three or more systems or the ERP's API cannot carry the load, a Microsoft Fabric lakehouse is built first, which is the ten to sixteen week build described in how long does a Fabric implementation take? and a capacity from £138 a month reserved. Migration from Tableau, Qlik or Excel: the model rebuild and report recreation described in how much does it cost to migrate from Tableau or Qlik to Power BI?.
What does not move it much
The number of reports, once the model exists. The number of users, beyond licences. The number of visuals on a page. A quote that is priced per report or per dashboard is pricing the wrong thing, and it is the clearest sign that the consultancy builds ad hoc reports rather than models.
How to compare quotes
Ask each consultancy the same six questions: is the deliverable a certified semantic model or a set of reports; who will own it afterwards and what training do they get; is the price fixed per phase or a day rate with no scope; how will each measure be reconciled to the source; will the model be in our Git repository with a deployment pipeline; and what happens when scope changes. Then compare the answers, not the totals. A low day-rate quote with no scope is the most expensive option in the market, because the scope is decided after the contract. How do I choose between Power BI consultancies? has the rest of the checklist and fixed price, not time and materials explains why the price is fixed.
What you get back
Across our engagements the average reduction in time spent producing recurring reports is around 70 per cent, because month end packs, sales reports and board decks come from one model rather than being rebuilt from exports; the other returns, decisions made on day two rather than day twelve, numbers that agree in the board meeting, and an analyst doing analysis rather than data entry, are the ones that matter more and are harder to put a figure on. How much can a Power BI consultant reduce reporting time? sets out how to count it in your own business. The Analytics Acceleration Programme page has the tiers in full, and the free audit will tell you which tier your estate is and what would move it.
Related reading
How do I choose between Power BI consultancies?
Can a Power BI consultancy build certified, governed datasets rather than ad hoc reports?
Fixed price, not time and materials: how we scope and price analytics work
How long does a Power BI reporting project take to deliver?
Simon Devine
Managing Director
Part of the Hopton Analytics team, delivering governed analytics programmes for UK mid-market organisations.



